Located on Hepenstal road at Hackham, this subdivision, with a range of allotment, was constructed in several stages between April 2019 and Dec 2020 totalling 140 allotments and reserves at a cost in excess of $5.8M.
Scope of Works
Earthworks—Spoil removal, levelling of blocks to BL, Level 1 Supervision to lots
Water & Sewer Reticulation - Service connection & connection to existing road
Stormwater Infrastructure to Roads & Back of Lot Works, Detention tank
CST - SAPN, NBN and GAS
Electrical - SAPN transformer, public lighting, conduits & pipes
Sleeper Retaining Wall
Concrete Works - Kerbs, Gutter, Footpath, Driveway
Pavements - Roads and car park finished with hotmix surface
Contact Bennett Plumbing and Civil for all your civil needs.